KARACHI — K-Electric has announced planned power outages on 1 May 2026, affecting 17 out of the city’s 2,129 feeders due to maintenance and repair work on transformers.
According to the utility company, the work will be carried out at various locations between 8:00am and 6:00pm. As a result, temporary electricity disruptions are expected in the affected areas.
Residents may face load-shedding ranging from a minimum of five hours to a maximum of 10 hours, depending on the location and nature of the maintenance work.
For a full list of affected locations and outage timings, please refer to the official K-Electric announcement attached below.
K-Electric consumers can check the feeders’ name and power outage duration here.
1. According to schedule the power will remain suspended at Bawani Challi feeder from 8:59 to 17:59.
2. Electricity will remain suspended at DADA CERAMIC feeder from 7:59 17:59
3. Power will not available at DEGESH FEEDER feeder frm 8:59 17:59
4. DOST MOHAMMAD 8:59 17:59
5. HABIB KNIT WEAR 8:59 17:59
6. IDEAL INDUSTRY (GUL BL-1) 9:00 18:00
7. IMAD ARIF 9:59 17:59
8. INTERNATIONAL CERAMIC 7:59 17:59
9. JEHLUM TEXTILE 7:59 17:59
10. MEHRAN TOWN 8:59 17:59
11. PRIME PACK 12:39 17:59
12. P-V26 RMU 9:59 16:59
13. SAGHIR CENTER (RASHID MINHAS) 8:59 17:59
14. SHABEEH HAIDER 8:59 17:59
15. SHAMSI GARMENT 8:59 17:59
16. SHOUKAT UMER HOSPITAL 9:00 18:00
17, VALIKA INDUSTRY 9:59 17:59

K-Electric said the outages are necessary to ensure the reliability and stability of the power supply system, though routine activities in affected areas may be disrupted.
Consumers have been advised to check whether their locality falls within the outage schedule.















